If you have a question about registering to vote or arranging a postal or proxy vote for the upcoming Ash Neighbourhood Planning Referendum, please call the Electoral Services Team on 07748 886624. Please note: this number is only for questions relating to voting at this referendum. The team answering cannot assist with any other matters.

Flood risk assessment

Flood risk assessments might be required if your project will take place in Flood Zone 1, 2 or 3 (including Zone 3b).

If your project takes place in Zone 1, a flood risk assessment is required if either:

  • the area has critical drainage problems
  • the area is affected by surface water flooding
  • the project site will be more than 1 hectare
  • the project will introduce new uses to the land which are more vulnerable to flooding than the old uses

All project in Zones 2 or 3 (including Zone 3b) require a flood risk assessment.

Read more information in:

  • our Local Plan: Strategy and Sites 2019 (Policy P4) 
  • the National Planning Policy Framework 2019 (paras 155 - 165)
  • the National Planning Policy Guidance for Flood Risk and Coastal Change (ID.7 paras 001 - 008)

Visit the Government's page (opens new window) for flood risk assessment standing advice.