Utilities and infrastructure assessment

This is required for all projects which:

  • include 50 or more properties
  • affect more than 1,000 square metres of floor space

The assessment should include details of:

  • fowl sewage
  • connections to water, electricity and gas
  • how fibre will be supplied to the premises
  • how infrastructure will be routed through the site

Read more information in our Local Plan: Strategy and Sites 2019 (policies ID1 and D1: Place Shaping, including Policy D1 (11) (b)).