This is required for residential sites of 25 or more properties. You need to provide a housing mix plan showing which properties will be accessible.

Make sure that:

  • 10% of new homes meet the criteria for 'accessible and adaptable dwellings' set out in the Building Regulations M4 (2)
  • 5% of new homes meet the criteria for 'wheelchair user dwellings' as set out in the Building Regulations M4 (3)

Read more information in our Local Plan: Strategy and Sites 2019 (Policy D2 and H1 (4)).